Simple, Transparent Pricing
Start free, upgrade when you need more. No hidden fees, no surprises.
Free
Everything you need to plan a project
- βUp to 3 projects
- βUnlimited tasks per project
- βInteractive Gantt charts
- βCritical path analysis
- βTime tracking β logged vs estimated per task
- βAI planning from text, photos & spreadsheets (25 credits/week)
- βShare with up to 2 collaborators
- β1 connected app (such as Google Calendar)
- βReal-time collaboration with live presence
- βCloud storage & sync
- βJSON/CSV import & export
- βPNG & PDF export (with watermark)
- βPortfolio timeline & activity feed across all projects
Pro
For professionals who manage multiple projects
- βUnlimited projects
- β250 AI credits/week
- βAI schedule insights & risk analysis
- βProject baselines & variance tracking
- βCustom work calendars & holidays
- βPremium export templates & layouts
- βWatermark-free exports
- βWord document export
- βExcel Gantt export (.xlsx)
- βCustom fields β up to 20 per project (2 on Free)
- βInvite up to 4 project collaborators with editor roles
- βUnlimited connected apps
- βSync Google and Outlook calendars together
- βPriority email support
Then $5/month Β· cancel anytime before day 14.
Teams
For teams that share one workspace β roles, Operations & pooled AI
- βEverything in Pro
- β2 full workspace members minimum ($10/month)
- βAdd or remove full members at $5/member/month
- βOne consolidated subscription for the workspace
- βOwner / Admin / Member / Viewer roles
- βOperations β recurring meetings, maintenance & routines
- β250 AI credits/week per member, pooled across the workspace
- βShared workspace settings
- βPriority email support
Then $5/member/month Β· cancel anytime before day 14.
Need SSO, provisioning, or custom terms? Contact us β
Advanced PM (included)
Pro
- Scheduling Working-time calendars, constraints, task modes and the hour-based schedule. Every other module builds on it.
- Resources Resource Sheet, assignments with units and work, the Resources, Usage and Team Planner views, leveling.
- Costs Rates, fixed costs, planned and actual cost per task, earned value in Reports.
- Tracking & baselines Status date, Baseline 1β10 and interim plans, Update Project, Mark on Track, the Tracking Gantt.
- Tables & filters Entry table beside the Gantt bars, named tables (Cost, Schedule, Trackingβ¦), AutoFilter, grouping and multi-sort.
- Gantt Pro Progress line, task path, split bars, multiple baselines, slippage lines, timescale tiers and view presets in the Gantt's eye menu.
- Network diagram The Network diagram view: tasks as boxes linked by their dependencies.
- Reports The Reports view: overview, burndown, milestones, costs, resources and earned value, printable.
- Formulas & indicators Formula, lookup and outline-code custom fields with graphical indicators and roll-ups.
- Master projects Subprojects inside a master project and links between tasks of different projects.
Teams
Everything in Pro
- Operations Repeating operations and processes for the whole workspace.
Frequently Asked Questions
What happens to my data if I downgrade?
Your data is always yours. If you downgrade, you keep all existing projects but cannot create new ones beyond the free limit. Nothing is ever deleted.
Is my data secure?
Absolutely. Your project data is securely stored in the cloud using industry-standard encryption. Access your projects from any device when signed in.
Can I cancel anytime?
Yes. During the 14-day free trial you can cancel with no charge. After the trial, you can cancel monthly or yearly billing at any time and keep your paid features until the end of the period. A cancelled Team workspace remains intact and read-only.
What are AI credits?
Every AI feature draws from one weekly credit balance that resets on Monday at 00:00 UTC. Generating a plan or a process costs 5 credits, adding tasks with AI 3, schedule insights 3, and a status summary or an @ai comment 1. Free includes 25 credits a week, Pro 250, and Teams 250 per paid member, pooled across the workspace. Credits for a generation that fails on our side are returned.
What are AI schedule insights?
AI schedule insights are a Pro feature that analyzes your project and surfaces risks, optimization opportunities, and recommended next actions. Results are cached for 24 hours, so reviewing the same unchanged schedule again uses no extra AI credits.
Can I try a paid plan before upgrading?
Yes β every new Pro or Team subscription starts with a 14-day free trial. You receive full access to the selected plan during the trial and are not charged if you cancel before it ends.
Do you offer annual billing?
Yes. Pro is $45/year, and Team is $45 per member/year with a 2-member minimum. Both are 25% below monthly billing.
What counts as a connected app?
A connected app is an outside account you link to LoopGantt, such as Google Calendar, Outlook, Slack or GitHub. Free includes one connected app, such as one calendar; Pro and Teams include as many as you need, so you can sync Google and Outlook calendars together. Your calendar feed link, calendars you subscribe to, API keys and webhooks don't count. Apps you already connected keep working, and you can always reconnect the same app.
Do I need to create an account?
Yes β creating a free account takes a few seconds and unlocks the full Gantt editor, cloud sync, AI-powered planning, and critical path analysis. No credit card required for the Free plan.
Your Next Project Plan Is Seconds Away
Start for free. No credit card required.